We have now completed this project of lifting 21 concrete sections with floating crane Lodbrok at Södertälje lock channel, Sweden for PEAB. Project was performed by placing the concrete elements on the seabottom, with the weight of 177 - 225ton, 22.5m long, 2.5m wide and 1.5m high. The concrete sections were partly delivered on barge Carrier 8 from Poland to Sweden for productioncompany Aarsleff. This project required precision and coordination, and thanks to great teamwork and close collaboration with all parties involved, the operation was carried out safely and according to plan.